Blog

What is involved during the onboarding process?

  • October 28, 2021

Upon receipt of your CAD files, CAD drafters will (1) create “polylines” or CAD software objects that correspond to each of the identifiable spaces on your floor plan. (2) The CAFM system will tag these polylined spaces with unique IDs and then link them to the departmental/service line/cost assignments you provided in Excel. (3) The CAD files are then run through a software checker to ensure that their properties match up with the requirements of the CAFM system.  Upon passing this drawings test, (5) the CAFM team will upload the files to the system. Following this step, (6) System admins will configure your users and software settings and (7) activate your account.

    Leave Your Comment Here

    MENU