How much time will it take to onboard a CAFM system
- October 28, 2021
The length of time to onboard a facility is directly linked to the square footage size of your facility. For a small 100,000 SQFT facility with accurate CAD drawings, we need less than a week to onboard the facility (assuming facility data is provided at kickoff). The onboarding time will increase for larger facilities, or if VLogic’s in-house services team is required to verify or update your drawings.